Current Projects Archives - PB&A Inc

LA Metro Westside Subway Extension-SOE Design

February 8, 2018

PB&A is serving as EOR for the temporary Shoring of Excavation for their client, Skanska/Traylor/Shea, for four underground stations that will comprise the Purple Line Extension, providing a high-speed alternative for commuters traveling between downtown Los Angeles, the Miracle Mile, Beverly Hills and Westwood. The 100 ft. excavation for the first of the Stations, La

Read More

LA Metro Regional Connector- Hope Station Shoring (SOE) for 100 Ft. Excavation

February 8, 2018

PB&A was retained by RCCJV (Skanska-Traylor) to provide the design for the Shoring of Excavation (SOE) for two of the stations at the LA Metro Regional Connector Project, 2nd and Hope Street and 2nd and Broadway. The Hope Station, when finished, will serve as one of the stations along a subterranean rail tunnel connecting the

Read More

Jamul Hollywood Casino

August 13, 2014

PB&A, Inc. was hired by the Architects, Marnell Companies, to provide an innovative permanent shoring design that would provide the support for a 100 foot excavation which would eventually become the underground parking structure for the new Casino.  The site presented a myriad of engineering challenges including,

Read More
Secured By miniOrange